← Global Cyber Intelligence
Confirmed outageResolvedOperation Hidden Strain (field report, 18 Nov 2026)
Freeport LNG: LNG export terminal tripped offline after an interruption in its power feed;...
Freeport LNG · Quintana / Freeport, Gulf Coast LNG
US LNG feedgas declined the week of the outage while all other terminals ran at full or peak levels; total US feedgas rebounded to about 19.8 Bcf/d for the week ending Nov 8, up almost 0.5 Bcf/d week on week.
- How confirmed
- reported
- First reported
- Oct 26, 00:00 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Nov 8, 00:00 UTC
- Sector
- Fuel and pipelines
- Condition
- degraded
- Systems
- LNG liquefaction trains; Grid power supply to terminal
- Redundancy used
- Unknown
- Remaining resilience
- Restored to full operations by early November
- Duration
- About 1 to 2 weeks to full operations
- Corroboration
- RBN LNG Voyager weekly headlines and summaries only (gated; search-snippet-only). No independent wire confirmation retrieved.
- Six dimensions
- service availability: export output reduced; operating conditions: power interruption; redundancy: single power feed dependency suspected; remaining capacity: restored; recovery quality: good: full operations within about 2 weeks; compounding exposure: electric grid dependency
Known impact
None to US consumers; reduced export feedgas.
Recovery
Full operations by week ending 2026-11-08
Timeline
- Oct 26, 00:00 UTC: Started
- Nov 3, 23:59 UTC: First public report
- Nov 8, 00:00 UTC: Ended
Sources
- RBN Energy · Nov 3, 00:00 UTC: LNG Voyager Weekly, Nov 3, 2026
- RBN Energy · Nov 10, 00:00 UTC: LNG Voyager Weekly, Nov 10, 2026
Not yet known
- Root cause of the power interruption (utility side or on-site); Exact feedgas drop in Bcf/d at Freeport
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.
We summarize and link; we do not republish articles. Spotted an error? Send a correction.