Columbia Gas Transmission (TC Energy), Mountaineer XPress: PRE-WINDOW CONTEXT

Columbia Gas Transmission (TC Energy), Mountaineer XPress · Appalachia

Up to 1.8 Bcf/d of supply bottlenecked.

How confirmed
reported
First reported
Sep 26, 00:00 UTC
Last updated
Nov 18, 00:00 UTC
Ended
Sep 26, 00:00 UTC
Sector
Fuel and pipelines
Condition
degraded
Systems
Interstate transmission; Appalachian production
Remaining resilience
Restored
Duration
Days to about a week
Corroboration
Procurement Resource summary of Reuters (published Oct 5, describing late Sept) plus BOE Report headline (snippet).
Six dimensions
service availability: no retail impact; operating conditions: line out; redundancy: other Appalachian takeaway; remaining capacity: reduced then restored; recovery quality: good; compounding exposure: low

Known impact

None reported.

Recovery

Returned to service late Sept 2026

Timeline

  • Sep 26, 00:00 UTC: Started
  • Sep 28, 23:59 UTC: First public report
  • Sep 26, 00:00 UTC: Ended

Sources

  • Procurement Resource · Oct 5, 00:00 UTC: US natural gas prices and Mountaineer Xpress pipeline outage
  • Reuters via BOE Report · Sep 28, 00:00 UTC: US natgas futures fall as West Virginia pipe returns, Northeast spot drops to multi-year lows

Not yet known

  • Exact outage dates; event date precedes the Oct 1 window and publication date is Oct 5

Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.

We summarize and link; we do not republish articles. Spotted an error? Send a correction.

Columbia Gas Transmission (TC Energy), Mountaineer XPress: PRE-WINDOW CONTEXT | Cyber Stopper