Official noticeResolvedOperation Hidden Strain (field report, 18 Nov 2026)

PJM Interconnection: Two Maximum Generation Emergency / Load Management Alert, Capacity Emergency, NERC...

PJM Interconnection · Valley Forge (headquarters, Wikidata headquarters location (P159))

Generation outages over 61,000 MW; PJM operating with about 66% of fleet capacity. A third-party report citing PJM's 202(c) application gives forecast demand about 111,500 MW on 10/13 and a forecast 900 MW shortfall to reserve requirement on 10/14 (secondary, not verified against the application).

How confirmed
confirmed
First reported
Oct 12, 19:49 UTC
Last updated
Nov 18, 00:00 UTC
Ended
Oct 15, 04:00 UTC
Sector
Electricity
Condition
emergency
Systems
Bulk generation adequacy, operating reserves; Demand response, interregional transfers
Redundancy used
Emergency DR, maintenance recall, 202(c) specified resources, conditional backup-generator authority at large loads
Remaining resilience
Low for the two days; PJM did not identify a need for specified resources from 10/15 and said emergency conditions were not expected past 10/14.
Duration
2 operating days (10/13 to 10/14)
Corroboration
PJM primary operations summary and PJM blog; DOE order page; trade press.
Six dimensions
service availability: maintained; operating conditions: emergency procedures; redundancy: consumed; remaining capacity: minimal; recovery quality: clean release; compounding exposure: heat plus maintenance plus transfer limits

Known impact

No load shed reported. Mandatory DR curtailments for enrolled customers.

Recovery

Released after 10/14; no further EEA in October.

Timeline

  • Oct 12, 19:49 UTC: Started
  • Oct 12, 19:49 UTC: First public report
  • Oct 15, 04:00 UTC: Ended

Sources

  • PJM Interconnection · Oct 29, 00:00 UTC: PJM Operations Summary, October 2026 Operations (SOS item 02, 2026-10-29)
  • PJM Inside Lines · Oct 15, 00:00 UTC: Providing Reliable Electricity in a New Reality
  • US DOE · Oct 12, 00:00 UTC: Federal Power Act Section 202(c): PJM Order No. 202-26-50
  • MGRID.org · Oct 12, 00:00 UTC: DOE Gives PJM a Four-Day Emergency Order as 61,591 MW of Generation Sits Out for Autumn Maintenance
  • T&D World · Oct 13, 00:00 UTC: T&D World article (FERC Oct 9 actions on PJM large loads and procurement)

Not yet known

  • Real-time reserve minimum reached on 10/13 and 10/14?; MW of DR actually delivered?; LMP and reserve shortage pricing on those days?

Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.