Official noticeResolvedOperation Hidden Strain (field report, 18 Nov 2026)
PJM Interconnection: Two Maximum Generation Emergency / Load Management Alert, Capacity Emergency, NERC...
PJM Interconnection · Valley Forge (headquarters, Wikidata headquarters location (P159))
Generation outages over 61,000 MW; PJM operating with about 66% of fleet capacity. A third-party report citing PJM's 202(c) application gives forecast demand about 111,500 MW on 10/13 and a forecast 900 MW shortfall to reserve requirement on 10/14 (secondary, not verified against the application).
- How confirmed
- confirmed
- First reported
- Oct 12, 19:49 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Oct 15, 04:00 UTC
- Sector
- Electricity
- Condition
- emergency
- Systems
- Bulk generation adequacy, operating reserves; Demand response, interregional transfers
- Redundancy used
- Emergency DR, maintenance recall, 202(c) specified resources, conditional backup-generator authority at large loads
- Remaining resilience
- Low for the two days; PJM did not identify a need for specified resources from 10/15 and said emergency conditions were not expected past 10/14.
- Duration
- 2 operating days (10/13 to 10/14)
- Corroboration
- PJM primary operations summary and PJM blog; DOE order page; trade press.
- Six dimensions
- service availability: maintained; operating conditions: emergency procedures; redundancy: consumed; remaining capacity: minimal; recovery quality: clean release; compounding exposure: heat plus maintenance plus transfer limits
Known impact
No load shed reported. Mandatory DR curtailments for enrolled customers.
Recovery
Released after 10/14; no further EEA in October.
Timeline
- Oct 12, 19:49 UTC: Started
- Oct 12, 19:49 UTC: First public report
- Oct 15, 04:00 UTC: Ended
Sources
- PJM Interconnection · Oct 29, 00:00 UTC: PJM Operations Summary, October 2026 Operations (SOS item 02, 2026-10-29)
- PJM Inside Lines · Oct 15, 00:00 UTC: Providing Reliable Electricity in a New Reality
- US DOE · Oct 12, 00:00 UTC: Federal Power Act Section 202(c): PJM Order No. 202-26-50
- MGRID.org · Oct 12, 00:00 UTC: DOE Gives PJM a Four-Day Emergency Order as 61,591 MW of Generation Sits Out for Autumn Maintenance
- T&D World · Oct 13, 00:00 UTC: T&D World article (FERC Oct 9 actions on PJM large loads and procurement)
Not yet known
- Real-time reserve minimum reached on 10/13 and 10/14?; MW of DR actually delivered?; LMP and reserve shortage pricing on those days?
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.