Anomaly, cause unknownResolvedOperation Hidden Strain (field report, 18 Nov 2026)
NYISO: Shared reserves activation with NYISO (-92 MW) following loss of a 650 MW...
NYISO; PJM · NYISO / PJM seam
Reserve sharing between PJM and NYISO for about 20 minutes, on the same day PJM was under EEA 1.
- How confirmed
- confirmed
- First reported
- Oct 13, 15:20 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Oct 13, 15:40 UTC
- Sector
- Electricity
- Condition
- elevated stress
- Systems
- Generation (combined cycle); Inter-ISO reserve sharing
- Redundancy used
- Shared reserves
- Remaining resilience
- Normal recovery; overlapped with PJM emergency day.
- Duration
- 20 minutes
- Corroboration
- Single primary source (PJM operations summary).
- Six dimensions
- service availability: normal; operating conditions: contingency; redundancy: used; remaining capacity: reduced briefly; recovery quality: quick; compounding exposure: coincided with PJM EEA 1
Known impact
None reported.
Recovery
Reserves released 11:40.
Timeline
- Oct 13, 15:20 UTC: Started
- Oct 13, 15:20 UTC: First public report
- Oct 13, 15:40 UTC: Ended
Sources
- PJM Interconnection · Oct 29, 00:00 UTC: PJM Operations Summary, October 2026 Operations (SOS item 02, 2026-10-29)
Not yet known
- Cause of unit trip and duration of unit outage.
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.