Anomaly, cause unknownStatus not statedOperation Hidden Strain (field report, 18 Nov 2026)
PJM / FirstEnergy: Long-running 138 kV post-contingency voltage warning (maintain 127.0 kV) in FE-APS:...
PJM / FirstEnergy · PJM FE-APS (Allegheny) zone
Persistent low post-contingency voltage risk at a 138 kV bus; load relief would be the remedy.
- How confirmed
- confirmed
- First reported
- Sep 2, 16:06 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Nov 18, 11:31 UTC
- Sector
- Electricity
- Condition
- reduced resilience
- Systems
- Sub-transmission voltage support
- Redundancy used
- None available per posting
- Remaining resilience
- Low locally.
- Duration
- About 7 weeks continuous, then recurring
- Corroboration
- Two primary PJM sources.
- Six dimensions
- service availability: normal; operating conditions: constrained; redundancy: none; remaining capacity: thin; recovery quality: unresolved; compounding exposure: winter load rising
Known impact
None reported.
Recovery
Not restored as of 11/18 posting.
Timeline
- Sep 2, 16:06 UTC: Started
- Sep 2, 16:06 UTC: First public report
- Nov 18, 11:31 UTC: Ended
Sources
- PJM Interconnection · Oct 29, 00:00 UTC: PJM Operations Summary, October 2026 Operations (SOS item 02, 2026-10-29)
- PJM Interconnection · Nov 18, 00:00 UTC: PJM Emergency Procedures postings board (Nov 16 to 18, 2026)
Not yet known
- Underlying cause (equipment outage, reactive deficiency)?; Planned fix date?
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.