Anomaly, cause unknownStatus not statedOperation Hidden Strain (field report, 18 Nov 2026)
PJM / AEP: Two post-contingency voltage warnings (maintain 127.0 kV at a 138 kV bus) in AEP...
PJM / AEP · PJM AEP zone
Local voltage contingency exposure.
- How confirmed
- confirmed
- First reported
- Nov 16, 11:19 UTC
- Last updated
- Nov 18, 00:00 UTC
- Sector
- Electricity
- Condition
- elevated stress
- Systems
- Sub-transmission voltage
- Redundancy used
- None available per posting
- Remaining resilience
- Low locally.
- Duration
- Unknown (no end time shown)
- Corroboration
- Single primary source.
- Six dimensions
- service availability: normal; operating conditions: constrained; redundancy: none; remaining capacity: thin; recovery quality: unknown; compounding exposure: low
Known impact
None reported.
Recovery
Unknown
Timeline
- Nov 16, 11:19 UTC: Started
- Nov 18, 23:59 UTC: First public report
- Nov 18, 00:00 UTC: Open on report date
Sources
- PJM Interconnection · Nov 18, 00:00 UTC: PJM Emergency Procedures postings board (Nov 16 to 18, 2026)
Not yet known
- End time and cause.
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.
We summarize and link; we do not republish articles. Spotted an error? Send a correction.