Anomaly, cause unknownResolvedOperation Hidden Strain (field report, 18 Nov 2026)
PJM: Transmission Loading Relief Level 0 on 10/01 and 10/13-14 on a 500 kV...
PJM · PJM north-to-south interface and PJM/MISO seam
Transfer limits named by PJM as constraining deliverability during the 10/12-14 emergency.
- How confirmed
- confirmed
- First reported
- Oct 1, 21:49 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Nov 17, 14:00 UTC
- Sector
- Electricity
- Condition
- elevated stress
- Systems
- Bulk transmission interfaces; Interregional transfers
- Redundancy used
- Congestion management
- Remaining resilience
- Interface constraints limit import of reserves into Mid-Atlantic load zones.
- Duration
- Hours per event
- Corroboration
- Primary PJM sources.
- Six dimensions
- service availability: normal; operating conditions: constrained; redundancy: congestion tools; remaining capacity: limited deliverability; recovery quality: clean; compounding exposure: coincides with capacity tightness
Known impact
None.
Recovery
Released
Timeline
- Oct 1, 21:49 UTC: Started
- Oct 13, 23:59 UTC: First public report
- Nov 17, 14:00 UTC: Ended
Sources
- PJM Interconnection · Oct 29, 00:00 UTC: PJM Operations Summary, October 2026 Operations (SOS item 02, 2026-10-29)
- PJM Interconnection · Nov 18, 00:00 UTC: PJM Emergency Procedures postings board (Nov 16 to 18, 2026)
- T&D World · Oct 13, 00:00 UTC: T&D World article (FERC Oct 9 actions on PJM large loads and procurement)
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.
We summarize and link; we do not republish articles. Spotted an error? Send a correction.