WSDOT: Inspectors found cracks in a support beam and in steel members under the...
WSDOT · US 101, Olympic Peninsula
Inspectors found cracks in a support beam and in steel members under the 95-year-old Hoh River Bridge (age per Peninsula Daily News snippet). Three around-the-clock six-day closures from Sept 24; reopened noon Oct 13; six more overnight closures Oct 13 to Oct 18 (ending 5:30 a.m. Oct 19); afterwards one-way alternating traffic 24 hours a day.
- How confirmed
- confirmed
- First reported
- Sep 24, 00:00 UTC
- Last updated
- Nov 18, 00:00 UTC
- Sector
- Aviation and transportation
- Condition
- reduced resilience
- Systems
- Steel superstructure
- Remaining resilience
- Single lane alternating operation; no replacement plan stated (longer-term steps to be determined).
- Duration
- Closures Sep 24 to Oct 19; restriction ongoing
- Corroboration
- state DOT release (primary) plus local paper snippet
- Six dimensions
- service availability: restricted; operating conditions: single_lane; redundancy: none; remaining capacity: reduced; recovery quality: temporary_fix; compounding exposure: rural_lifeline
Known impact
Repeated full closures of US 101 at the Hoh River (a rural route with long detours, detour length not stated); ongoing one-way alternating traffic.
Recovery
Partial: emergency repairs restored one-way alternating access.
Timeline
- Sep 24, 00:00 UTC: Started
- Oct 6, 23:59 UTC: First public report
- Nov 18, 00:00 UTC: Open on report date
Sources
- WSDOT · Oct 9, 00:00 UTC: Overnight closures on US 101 at the Hoh River Bridge scheduled for Oct. 13-18 to finish emergency work
- Peninsula Daily News · Oct 6, 00:00 UTC: Hoh River bridge to be closed starting Thursday
Not yet known
- Load posting?; Replacement funding and timeline?
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.
We summarize and link; we do not republish articles. Spotted an error? Send a correction.