Anomaly, cause unknownStatus not statedOperation Hidden Strain (field report, 18 Nov 2026)
DC Water: Long-tail of the January 2026 Potomac Interceptor sewer collapse
DC Water · Potomac MD / Washington DC border, Potomac Interceptor corridor (54 miles)
Part of a 10-year, $625 million Potomac Interceptor Rehabilitation Project.
- How confirmed
- confirmed
- First reported
- Nov 3, 00:00 UTC
- Last updated
- Nov 18, 00:00 UTC
- Ended
- Dec 23, 00:00 UTC
- Sector
- Water and utilities
- Condition
- reduced resilience
- Systems
- Regional sewer interceptor; Bypass pumping; C&O Canal used as conveyance
- Redundancy used
- Yes: canal used as emergency conveyance; temporary bypass pumping
- Remaining resilience
- Reduced until permanent bypass and sliplining finish
- Duration
- About 10 months and continuing
- Corroboration
- Three DC Water releases (primary).
- Six dimensions
- service availability: sewer service maintained via bypass; operating conditions: emergency repairs; redundancy: temporary bypass in use; remaining capacity: reduced; recovery quality: in progress; compounding exposure: storm inflow during repairs
Known impact
Canal closure, traffic closures; earlier contamination cleanup (8,500 tons of soil removed).
Recovery
Spring (year not stated)
Timeline
- Nov 3, 00:00 UTC: Started
- Nov 3, 00:00 UTC: First public report
- Dec 23, 00:00 UTC: Ended
Sources
- DC Water · Oct 30, 00:00 UTC: DC Water begins restoration of C&O Canal after clean-up completed
- DC Water · Nov 3, 00:00 UTC: Traffic advisory: periodic traffic impacts on Clara Barton Parkway (Potomac Interceptor emergency repair)
- DC Water · Nov 18, 00:00 UTC: DC Water news listing
Not yet known
- Exact collapse date and spill volume to the Potomac; Condition grades of other interceptor sections
Operation Hidden Strain (field report, 18 Nov 2026). Historical baseline, not live data. State shown is as of the report date.